Payload / Mission
Swift Boost Mission
Contracted by NASA under the Small Business Innovation Research Phase 3 contract, Katalyst Space Technologies' LINK servicing spacecraft will rendezvous and attach to NASA’s Neil Gehrels Swift Observatory to re-boost its orbit. This aims to demonstrate a key capability for the future of space exploration and extending the Swift mission’s science lifetime in gamma ray astronomy.
🎬 Recent videos







🚀 About the rocket: —








📰 News

The LINK spacecraft aims to rendezvous, capture, and reboost NASA’s 21 year old Neil Gehrels Swift Observatory.

Katalyst Space’s LINK on-orbit servicing spacecraft is on its way to reboost NASA’s Swift observatory. Northrop Grumman’s Pegasus-XL rocket launched LINK this morning and contact has been successfully established, the […]

A Pegasus XL launched a mission to reboost a NASA astrophysics spacecraft on what may be the final flight of that rocket. The post Pegasus launches Swift reboost mission appeared first on SpaceNews.

A first-of-its-kind mission to raise the orbit of NASA’s Neil Gehrels Swift Observatory is poised for launch no earlier than Thursday, July 2, 5:09 a.m. EDT (9:09 p.m. UTC+12), from Kwajalein Atoll, part of the Republic of the Marshall Islands in the South Pacific Ocean. A robotic servicing spacecraft called LINK, built by Katalyst Space, will blast […]

Several orbital launches are scheduled worldwide this week. A mission to rescue the Swift observatory… The post Launch Preview: Swift rescue mission, final Atlas satellite launch appeared first on NASASpaceFlight.com.

In its first mission since 2021, a Northrop Grumman Pegasus XL rocket is scheduled to… The post Pegasus XL set to air launch Swift Boost Mission to save NASA space telescope appeared first on NASASpaceFlight.com.

A mission to raise the orbit of NASA’s Swift observatory is poised for launch June 30.

This week’s launch manifest includes six orbital launches worldwide, including the first Pegasus XL launch… The post Launch Preview: Pegasus XL to launch amongst Falcon 9 and Chinese missions appeared first on NASASpaceFlight.com.

A high-risk mission to raise the orbit of a NASA astrophysics spacecraft is set to launch later this month after less than a year of development. The post Swift reboost mission ready for launch appeared first on SpaceNews.
Der vierte Flug einer Ariane 6 dieses Jahres wird mit dem Flug VA270 mit einer Ariane 62 den Wettersatelliten MTG-I2 am 27. August von Kourou aus in den Orbit befördern. Entwickelt wurde MTG-I2 durch die ESA, gebaut von einem Konsortium europäischer Firmen, vornehmlich Thales Alenia Space, OHB und Leonardo, und betrieben werden wird er wieder […] Der Beitrag 20. 7. 2026 – Arianespace startet MTG-I
Der 2. Testflug der Spectrum von Isar Aerospace ist nach Angabe von NextSpaceFlight ab 6. August möglich. Damit könnte man auf einen ähnlichen Starttermin wie RFA mit dem Erstflug der RFA One kommen, welcher nach Startplatzfreigabe von SaxaVord ab 10. August möglich ist. Der Beitrag 12. 7. 2026 – 2. Testflug der Spectrum im August möglich erschien zuerst auf Raumfahrer.net .
Die Kommissionierung des autonomen Rettungsraumfahrzeugs LINK von Katalyst, das die Umlaufbahn des Neil-Gehrels-Swift-Observatoriums der NASA anheben soll, ist bereits in vollem Gange.Ein Blogbeitrag der National Aeronautics and Space Administration NASA. Quelle: NASA / Alise Fisher, 10. Juli 2026 Nach dem Start am 3. Juli, bei dem LINK wie erwartet in die Umlaufbahn gebracht wurde, befindet […] D
